首页> 外文会议>International Conference on Power System Technology >Measuring Partial Discharge on EHV DC Cable Accessories Insulated with Silicone Rubber in Development Tests
【24h】

Measuring Partial Discharge on EHV DC Cable Accessories Insulated with Silicone Rubber in Development Tests

机译:在开发测试中测量用硅橡胶绝缘的超高压直流电缆附件的局部放电

获取原文

摘要

In the booming market of high voltage DC cables, the progress of developing accessories become a main bottleneck. In this paper, we firstly introduce our DC cable accessories insulated with silicone rubber, a material currently applied much more frequently in AC than in DC. Then, our experience on testing the 320 kV system, as well as our preliminary experience on diagnosing the 500 kV system in factory will be introduced and discussed. Based on the discussion, we recommend to perform partial discharge tests before load cycle tests to control the quality of installation.
机译:在蓬勃发展的高压直流电缆市场中,配件开发的进展成为主要瓶颈。在本文中,我们首先介绍用硅橡胶绝缘的直流电缆附件,这种材料目前在交流中比在直流中使用的频率要高得多。然后,将介绍和讨论我们在测试320 kV系统方面的经验以及在工厂中诊断500 kV系统的初步经验。根据讨论,我们建议在负载循环测试之前执行局部放电测试,以控制安装质量。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号