Study on the Transmission Capability of Dianxibei UHVDC Project and the Method to Enhance It in Early Stage of the Project’s Operation

机译:滇西北特高压直流输电工程的输电能力研究及提高输电能力的方法

获取原文

摘要

In early stage of Dianxibei UHVDC project's operation, the production progress of the accessory power plants at the sending-end lags far behind the original schedule, which causes a lack of generation problem in sending-end grid. The effects on transmission capability of Dianxibei UHVDC project from diverse aspects, such as the stability of the islanding system after the sending-end converter station switching into islanding mode, the overvoltage of the islanding system and the harmonic resonance risks of the islanding system are analyzed in this paper. The analysis result shows that the transmission capability of Dianxibei HVDC project is limited and unable to meet the demand of system commission tests. For the purpose of enhancing transmission capability of Dianxibei UHVDC project, a stopgap according to which the UHVDC system will block itself following a preset strategy if the converter station switches into islanding mode is presented, and the transmission capability of Dianxibei UHVDC project after adopting the stopgap is also analyzed. Finally, the quitting conditions of the stopgap, under which Dianxibei UHVDC project can reach it's rated transmission capacity safely without any stopgap, is researched. The study results of this paper guarantees the security and adequacy of Dianxibei UHVDC project's power transmission in early stage of it's operation, and also provide significant guidance on experiments conducting in system commissioning test periods of the project.
机译:滇西北特高压直流工程运行初期,发端配套发电厂的生产进度远远落后于原定计划,致使发端电网缺乏发电问题。从发送端换流站切换为孤岛模式后,孤岛系统的稳定性,孤岛系统的过电压以及孤岛系统的谐波谐振风险等多个方面对垫西北特高压直流输电项目输电能力的影响进行了分析。在本文中。分析结果表明,滇西高压直流输电工程的输电能力有限,无法满足系统调试测试的要求。为了提高滇西北特高压直流输电项目的传输能力,提出了一种变电站,即如果换流站切换到孤岛模式,则UHVDC系统将按照预设策略阻塞自身,并采取了权宜之计。也进行了分析。最后,研究了滇西北特高压直流输电项目在没有任何停顿的情况下安全地达到额定输电容量的停顿条件。本文的研究结果保证了垫溪北特高压直流输电项目投运初期的安全性和充分性,也为该项目的系统调试测试阶段的实验提供了重要的指导。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号