首页> 外文会议>International conference on nuclear engineering;ICONE18 >STUDY ON A METHODOLOGY OF HUMAN FACTOR ENGINEERING OPERATING EXPERIENCE REVIEW FOR NUCLEAR POWER PLANT
【24h】

STUDY ON A METHODOLOGY OF HUMAN FACTOR ENGINEERING OPERATING EXPERIENCE REVIEW FOR NUCLEAR POWER PLANT

机译:核电站人机工程操作经验评价方法学研究

获取原文

摘要

The reviewing of operating experience at nuclear power plants (NPP) is not only critically important to safe and reliable operations, but also useful to guide the design of new plants which are similar to the current one under review. How to identify and analyze the safety-related operating experience and then implement a more extensive review is a vital and challengeable issue. In this paper, a methodology of human factor engineering (HFE) operating experience review (OER) is proposed for NPP. The need for the application of HFE in the life cycle activities of NPP and other nuclear facilities has been demonstrated by plant operating histories and regulatory and industry reviews. As a very important element of HFE, the OER is performed from the beginning of the design process. The main purpose of performing an OER is to verify that the applicant has identified and analyzed HFE-related safety problems and issues in previous designs that are similar to the current one. In this way, negative features associated with predecessor designs may be avoided in the current NPP design while retaining positive features. The research of OER concentrates on the aspect of review criterion, scope and implementation procedure of the HFE-related operating experience. As the NRC requirement, the scope of operating experience can be divided into six types in accordance with sources of information. The implementation procedures of USA and China are introduced, respectively. The resolution of HFE OER issues involve function allocation, changes in automation, HSI equipment design, procedures, training, and so forth. The OER conclusions can contribute to other HFE activities and improve the safety, reliability and usability of the HSI design in NPP.
机译:审查核电厂的运行经验不仅对安全可靠的运行至关重要,而且对指导与目前正在审查的新电厂相似的新电厂的设计也非常有用。如何识别和分析与安全相关的操作经验,然后进行更广泛的审查是一个至关重要的挑战。本文针对核电厂提出了人因工程(HFE)操作经验评审(OER)的方法。工厂的运行历史以及监管和行业评论表明,在核电厂和其他核设施的生命周期活动中应用HFE的必要性。作为HFE的一个非常重要的元素,从设计过程的开始就执行OER。进行OER的主要目的是验证申请人是否已识别和分析了HFE相关的安全性问题以及先前设计中与当前设计类似的问题。这样,可以在当前的NPP设计中避免与先前设计相关的负面特征,同时保留正面特征。 OER的研究集中在HFE相关操作经验的审查标准,范围和实施程序方面。作为NRC的要求,操作经验的范围可以根据信息来源分为六类。介绍了美国和中国的实施程序。解决HFE OER问题涉及功能分配,自动化更改,HSI设备设计,过程,培训等。 OER结论可以有助于其他HFE活动,并提高NPP中HSI设计的安全性,可靠性和可用性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号