Neelum-Jhelum hydroelectric project-Environmentally sound hydropower

机译:Neelum-Jhelum水电项目-无害环境水电

获取原文

摘要

This paper presents the Neelum-Jhelum Hydroelectric Project in Jammu Kashmir in northern Pakistan. Due to its importance to the future power supply to the country, the Neelum-Jhelum Hydroelectric Project has long been prioritiesed by the Government of Pakistan. The feasibility study has recently been updated by a team of Norwegian consultants and WAPDA staff led by Norconsult International A.S who are currently carrying out the detailed design of the project. Neelum-Jhelum is a run-of-river scheme and utilises a gross head of about 420 m by diverting the Neelum River water from the village of Nauseri on the Neelum River to the lower limb of jhelum River through a 32.5 km long tunnel system The optimised maximum power station output is 969 MW, corresponding to a designed maximum discharge of 280 m~3/s. The optimised project yields an average annual energy generation of 5254 GWh. Due to the adoption of an underground layout and careful planning the project has limited environmental impact and the recommended mitigation measures ensure that it not adversely consume bioloical resources nor adversely impact on human communities. When implemented the project will be the first underground hydroelectric project in Pakistan of its kind and the experience gained from design and construction of its long tunnel system should act as a catalyst for development of the country's hydropower resources by way of environmentally friendly underground solutions.
机译:本文介绍了巴基斯坦北部查Jam克什米尔的Neelum-Jhelum水电项目。由于Neelum-Jhelum水电项目对该国未来的电力供应十分重要,长期以来一直是巴基斯坦政府的优先重点。可行性研究最近由由Norconsult International A.S牵头的挪威顾问团队和WAPDA工作人员进行了更新,他们目前正在对该项目进行详细设计。 Neelum-Jhelum是一个泛滥的计划,通过一条32.5公里长的隧道系统将Neelum河的水从Neelum河上的Nauseri村分流到Jehelum河的下肢,从而利用了约420 m的总水头。优化的最大电站输出为969 MW,相当于设计的最大排放量为280 m〜3 / s。经过优化的项目产生的年平均发电量为5254 GWh。由于采用了地下布局并进行了周密的计划,因此该项目对环境的影响有限,建议采取的缓解措施可确保该项目不会不利地消耗生物和生物资源,也不会对人类社区造成不利影响。该项目一旦实施,将是巴基斯坦同类项目中的第一个地下水电项目,其长隧道系统的设计和建设经验将通过环境友好的地下解决方案,促进该国水电资源的开发。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号