首页> 外文会议>International conference on hydropower >Hydropower projects and environmental impact analysis
【24h】

Hydropower projects and environmental impact analysis

机译:水电项目与环境影响分析

获取原文
获取外文期刊封面目录资料

摘要

Hydropower is one of the main sources of energy for the present `power-hungry' growing world. As environment is one of the main considerations and in order to protect the ever-polluting environment, a well developed method is to be adopted and Environmental Impact Analysis (EIA) is a suitable one. This paper presents the application of EIA to the hydropower projects in brief and in dtail in the light of the case study of Tehri dam, which would have been the fifth highest dam in the world, if constructed, rated as the most hazardous dam by ICOL and a frightening illustration of the failure of governance.
机译:水力发电是当今“耗电”增长世界的主要能源之一。由于环境是主要考虑因素之一,并且为了保护不断受到污染的环境,将采用完善的方法,而环境影响分析(EIA)是一种合适的方法。本文根据Tehri大坝的案例研究,简要,详细地介绍了EIA在水电项目中的应用,如果建造的话,Tehri大坝将是世界第五大水坝,被ICOL评为最危险的大坝。以及治理失败的可怕例证。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号