首页> 外文会议>International conference on hydropower >Coordinated operation of a hydrothermal power system: The case of Nepal
【24h】

Coordinated operation of a hydrothermal power system: The case of Nepal

机译:水热发电系统的协调运行:尼泊尔的案例

获取原文
获取外文期刊封面目录资料

摘要

The benefits of coordinated operation of hydro electric plants and thermal plants have now been recognized both in terms of the cost of power generation and the reliability of supply. A methodology based on an hierarchical use of two models is presented for operation planning of a hydro dominated power system. The first model is a hydro scheduling model based on stochastic dynamic progranning technique which finds an optimal monthly operation policy of a hydro plant with seasonal storage reservoir. The objective is to minimize the system operation cost. The second model is a probabilistic production costing (PPC) model suitable for simulation of power generation of a mixed hydrothermal system which is also used by the hydro scheduling model to calculate the system operation costs and reliabilty levels for different states and stages of its operation. The models are applied to the case of Nepal.
机译:从发电成本和供电可靠性两方面,水力发电厂和热力发电厂协调运行的好处现已得到认可。提出了一种基于两个模型的分层使用的方法,用于水力发电系统的运行规划。第一个模型是基于随机动态规划技术的水力调度模型,该模型可找到具有季节性储水库的水电厂的最佳月度运行策略。目的是使系统运行成本最小化。第二个模型是适用于模拟混合水热系统发电的概率生产成本计算(PPC)模型,水电调度模型还使用该模型来计算系统不同阶段和不同运行阶段的系统运行成本和可靠性水平。该模型适用于尼泊尔的情况。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号