TBM-tunnelling at Sauda Power Project

机译:索达电力项目的隧道掘进机隧道掘进

获取原文

摘要

The Sauda river-system in Norway is from nature well suited for hydropower developments. Today four power-stations with a totoal installed capacity of 160 MW are running, with an average annual production of 1020 GWh. The plants are constructed in different periods since 1913 when the river was first developed for electric powerproduction. Each construction was the optimm solution at the time, however, modern techniques like tunnelling by a Tunnel Boring Machine -TBM-has created new alternatives for hydro-power design and greatly increased the economically exploitable potential of the river-system. The owner of the plants is therefore planning a new hydropower scheme which will increase the installed capacity to 520 MW and the average annually production to 2120 GWh.
机译:挪威的萨达河水系自然而然地适合水电开发。如今,四个总装机容量为160兆瓦的电站正在运行,年平均发电量为1020 GWh。自从1913年这条河最初被开发用于电力生产以来,这些电厂就在不同时期建造。当时的每个建筑都是最佳的解决方案,但是,诸如隧道掘进机(TBM)隧道掘进的现代技术为水力发电设计创造了新的替代方案,并极大地增加了河流系统的经济可利用潜力。因此,电厂的所有者正在计划一项新的水电计划,该计划将把装机容量增加到520兆瓦,年平均产量将增加到2120吉瓦时。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号