首页> 外文会议>International conference on hydropower >Benefit of capacity expansion in hydropower stations in virew of power exchange contracts and transmission grid utilization
【24h】

Benefit of capacity expansion in hydropower stations in virew of power exchange contracts and transmission grid utilization

机译:鉴于电力交换合同和输电网的利用,水力发电站扩容的好处

获取原文

摘要

This paper will focus on hydropower capacity utilization with respect to transmission grid capacity, losses and market situation. New hydropower capacity can be built in different watercourses and the influence of transmission grid losses and restrictions on the benefit of new capacity in different areas of the conutry will be found by system simulations. Power system simulations will be performed with the newly developed Energy and Power Flow model. This model is an integration of the well known and widely used PPower Poll Model, and routines for load-flow analysis. This is the nost comprehensive model for power system simulations in Norway today. Simulation results gives new insight to the interaction between hydropower production system, market utilization and main grid losses and restrictions.
机译:本文将着重于输电电网容量,损耗和市场情况方面的水电容量利用。可以在不同的河道中建立新的水电容量,并且通过系统仿真可以发现输电网络损耗的影响以及对新容量的限制在该科特迪瓦的不同地区。电力系统仿真将使用新开发的“能源和潮流”模型进行。该模型是众所周知的和广泛使用的PPower Poll模型以及用于潮流分析的例程的集成。这是当今挪威用于电力系统仿真的最新综合模型。仿真结果为水电生产系统,市场利用与主电网损失和限制之间的相互作用提供了新的见解。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号