首页> 外文会议>International conference on hydropower >Planning and design of desilting basins in Himalayas-A case study
【24h】

Planning and design of desilting basins in Himalayas-A case study

机译:喜马拉雅山沉沙池的规划设计-以个案研究

获取原文

摘要

The paper highlights the planning and design aspects of desilting basins in Himalayan rivers with specific reference to Nathpa Jhakri underground hydroelectric project under execution. The project is a run-of-the-river project on river Satluj which experiences severe sediment transport. The project comprises of an underground desilting basin complex with four parallel basins, with hoppers and flushing conduits at the bottom to control undesirable sediments from entering the turbines. The design is aimed at eliminating sediments of particle size 0.2mm and above in the basins. The hydraulic performance of the proposed basin as studied on a physical model as well as simulated in a numerical model is highlighted in this paper.
机译:本文重点介绍了喜马拉雅河流域淤积盆地的规划和设计方面,并特别参考了正在执行的纳斯帕贾克里地下水力发电项目。该项目是萨特鲁日河上的一个上游项目,经历了严重的泥沙输送。该项目包括一个具有四个平行流域的地下淤泥流域综合体,其底部装有料斗和冲洗管道,以控制不良沉积物进入涡轮机。该设计旨在消除水池中粒径大于等于0.2mm的沉积物。本文重点介绍了拟议盆地的水力性能,无论是在物理模型上进行研究还是在数值模型中进行模拟。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号