An Assessment on the Mechanical Response of Shield Tunnel Induced by Pit Excavation- A Case Study

机译:基坑开挖引起盾构隧道力学响应的评估-以案例研究为例

获取原文

摘要

In order to guarantee the safety of underlying tunnel in excavation phase, a numerical investigation which aims at evaluate the additional internal forces of existing shield tunnels is conducted. Firstly, the additional stresses acting on existing tunnel induced by excavation project is obtained from Mindlin's solution. Then, existing tunnels are treated as an elastic beam resting on Winkler foundation, the response of tunnel including longitudinal deformation, internal forces, caused by adjacent deep excavation is calculated. By considering the uncertainty of soil parameters, tunnel longitudinal stiffness and excavated depth, Monte Carlo simulation technique was applied to predict the expected risk levels quantitatively. Results of a case study indicate a good agreement between calculation and field observation.
机译:为了保证基础隧道在开挖阶段的安全,进行了数值研究,旨在评估现有盾构隧道的附加​​内力。首先,从明德林的解决方案中获得了由开挖工程引起的作用在现有隧道上的附加应力。然后,将现有的隧道作为弹性梁放置在Winkler地基上,计算隧道的响应,包括纵向变形,内力,这些应力是由邻近的深基坑引起的。考虑到土壤参数,隧道纵向刚度和开挖深度的不确定性,采用蒙特卡罗模拟技术定量预测了预期的风险水平。案例研究的结果表明计算和现场观察之间有很好的一致性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号