Simulation Study on the Deformation of Sewage Pipe Tunnel with Different Construction Schemes

机译:不同施工方案的污水管道隧道变形仿真研究

获取原文

摘要

The construction of the pipe pile, the backfill of the foundation soil and the load of the upper building will have an important influence on the sewage interception pipe tunnel. It is the key in the construction process of pile how to select the optimal construction scheme to reduce the sewage pipe affect the deformation of tunnel. It is using Mohr-Coulomb-Complete Elastoplastic model for the construction process of jacked pile is simulated and the impact of the pile construction on the surrounding soil for the basic design scheme and obtained with the increase of depth. It increases especially in the tunnel close to the top of the pile end tunnel pile construction influence on tunnel, and deformation increases rapidly. The soil backfill deformation near the surface influence gradually decreased with the increase of the depth. The upper part of the building load into the strong weathered strata is through the pipe mainly for the long period effect. The deformation of near pile tunnel is greater than far pile caused by non-uniform convergence of the tunnel section and the deformation on both sides of the difference of the pile spacing is about 4mm.The displacement of the tunnel is small and the relationship between the approximate exponential law.
机译:管桩的施工,地基土的回填和高层建筑的负荷将对排污管隧道产生重要影响。如何选择最佳的施工方案,减少排污管对隧道的变形影响,是桩施工过程中的关键。利用Mohr-Coulomb-Complete弹塑性模型对顶推桩的施工过程进行了模拟,并作为基本设计方案,随深度的增加而获得了桩身对周围土壤的影响。尤其是在靠近桩端隧道顶部的隧道中,它增加了,这对隧道的影响很大,并且变形迅速增加。随着深度的增加,地表附近土壤回填变形逐渐减小。进入强风化地层的建筑负荷的上部主要是通过管道,这是长期影响。隧道断面不均匀收敛引起的近桩隧道变形大于远桩变形,桩间距差两侧的变形约为4mm,隧道位移小,与隧道之间的关系近似指数定律。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号