首页> 外文会议>International Conference on Electrical Electronic Engineering >Extension of the largest Turkish oil refinery's electrical power system
【24h】

Extension of the largest Turkish oil refinery's electrical power system

机译:扩大土耳其最大的炼油厂的电力系统

获取原文

摘要

This paper describes the works and studies made in one Industrial Plant in TURKEY, to upgrade the existing 45 MW electrical generation capacity to 85 MW through an interconnection between the existing generation systems and national electrical network. Through this extension major modifications have been made in connection lines between Industrial Plant electrical system and national electrical network and the electrical distribution system in order to restore the system reliability, operational flexibility and equipment maintainability. In this study, main design criteria, power system analyses, two level medium voltage and low voltage distribution system installation, automation, load control of generation, distribution and control room revision during the extension project are reviewed. The aim of this paper to make recommendations based on the learning experiences during the implementation of this project and to assist the reader faced with a similar major industrial plant expansion projects.
机译:本文描述了在土耳其的一个工业工厂中进行的工作和研究,通过现有发电系统和国家电网之间的互连将现有的45 MW发电能力提高到85 MW。通过此扩展,已对工业工厂电气系统与国家电网和配电系统之间的连接线路进行了重大修改,以恢复系统的可靠性,操作灵活性和设备可维护性。在这项研究中,对扩建项目期间的主要设计标准,电力系统分析,两级中压和低压配电系统的安装,自动化,发电的负荷控制,配电和控制室的修改进行了回顾。本文旨在根据项目实施过程中的学习经验提出建议,并帮助读者应对类似的大型工业厂房扩建项目。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号