Analysis of the FIDIC Contract Applied in Our Hydropower Project

机译:FIDIC合同在我国水电项目中的应用分析

获取原文

摘要

Concentrating on the risk sharing, the unit price of contract and contract variation, the claims of contract variation and the status of engineer, this article analyzes the feature of FIDIC contract, according to actual condition of our hydropower project, then brings in the method of making the unit price of contract and contract variation and the solution of contract variation claims.
机译:着眼于风险分担,合同单价和合同变更,合同变更索赔和工程师的身分,本文分析了FIDIC合同的特点,根据我国水电项目的实际情况,提出了解决方案。制定合同单价和合同变更以及合同变更索赔的解决方案。