Construction Delay Study of South-to-North Water Transfer Project Based on Factor Analysis

机译:基于因子分析的南水北调工程建设延误研究

获取原文

摘要

Delays are among the most phenomena in construction industry. They cause not only the increase of construction cost but also the loss of business income in the future. There are many uncertain factors which increase risks in large-scale construction projects. South-to-North Water Transfer Project is a magnificent water diversion project which plays a significant part in our country economic development. This paper collects delay factors on the basis of questionnaire feedback from different parts (clients, designers, contractors, and consultants) that related to the project. Based on the data, the paper uses principal components analysis method in the factor analysis to simplify variables to several dimensions and find the main factors. We also do further research on the projectrelated, client-related and contractor-related delay factors respectively. The result indicates that many delay factors are correlative and the poor communication, client's unpractical requirement, delay payment to contractors, inadequate qualification and inexperience of contractors are important factors. It finds that the use of new technology and information should be enhanced and precaution measures should be taken to reduce the risks in construction delays.
机译:延误是建筑行业中最常见的现象。它们不仅会导致建筑成本的增加,还会导致未来业务收入的损失。有许多不确定因素会增加大型建设项目的风险。南水北调工程是一项宏伟的引水工程,在我国经济发展中发挥了重要作用。本文根据与项目相关的不同部分(客户,设计师,承包商和顾问)的问卷反馈收集延迟因素。基于这些数据,本文在因子分析中使用主成分分析方法将变量简化为多个维度并找到主要因子。我们还将分别对与项目相关,与客户相关和与承包商相关的延迟因素进行进一步研究。结果表明,许多延迟因素是相关的,沟通不畅,客户的不切实际要求,对承包商的延迟付款,承包商资格不足和经验不足是重要因素。它发现应加强对新技术和信息的使用,并应采取预防措施以减少施工延误的风险。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号