Integrated Control of the Project Cost and Schedule Based on CPM by EVA and WBS

机译:EVA和WBS基于CPM的项目成本和进度计划的集成控制

获取原文

摘要

Carrying on control to the quality, the cost and the schedule is the main work, target of the modern project management. Among them, the quantity is the most basic request of a project management, which is generally set according to the project target, and the cost and the schedule are the two aspects which can be operated in a specific way in project management. So the main mission of the modern project management is to look for a superior solution of the cost and the schedule under the condition of guaranteeing the quantity. This paper combines the Critical Path Method (CPM) and technique of Work Breakdown Structures (WBS) and carries on the Earned Value Analysis (EVA) to the critical path, in order to attain the purpose of integrated control of the project cost and schedule.
机译:对质量,成本和进度进行控制是现代项目管理的主要工作,目标。其中,数量是项目管理的最基本要求,通常是根据项目目标确定的,成本和进度是在项目管理中可以具体操作的两个方面。因此,现代项目管理的主要任务是在保证数量的条件下寻找成本和进度的优良解决方案。本文结合关键路径法(CPM)和工作分解结构(WBS)技术,对关键路径进行了挣值分析(EVA),以达到对项目成本和进度进行综合控制的目的。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号