首页> 外文会议>International conference on construction real estate management >Method of Adjusting Price in Unit Price Contract Based on Bill Quantity Estimation of Construction Works
【24h】

Method of Adjusting Price in Unit Price Contract Based on Bill Quantity Estimation of Construction Works

机译:基于工程量清单估算的单价合同价格调整方法

获取原文

摘要

Problems of common price-adjusting methods are shown in this paper. Based on factor analysis of engineering cost, the paper disassembles project cost into variable cost, fixed cost and half-fixed cost. Mode of price changing with work quantity and construction duration is discussed here. Priceadjusting method of separated projects in different status in critical chain scheduling is put forward. The method is proved reasonable in an example in this paper.
机译:本文介绍了常见的价格调整方法存在的问题。在工程成本因素分析的基础上,将工程成本分解为可变成本,固定成本和半固定成本。价格随工作量和工期变化的模式在这里讨论。提出了关键链调度中处于不同状态的分离项目的价格调整方法。实例证明该方法是合理的。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号