首页> 外文会议>International Conference on Construction Real Estate Management >Study on Risk Analysis Methods of International Project Based on Rough Neural Network
【24h】

Study on Risk Analysis Methods of International Project Based on Rough Neural Network

机译:基于粗糙神经网络的国际项目风险分析方法研究

获取原文

摘要

Aimed at the risk analysis of the whole life cycle procedure of international project,based on the rough set theory this article gives us the decision table of risk rating analysis that using the rough set to reduce the attribute and attribute valuable of the decision table,to fund the main characteristic attribute that initiates all rate risks; And then combining the model of neural network to analysis,avoiding the international contractor spending more time on risk analysis,according to these we can make the decision on whether to bid or not and also the biding cost.
机译:针对国际项目整个生命周期过程的风险分析,基于粗糙集理论,本文给出了风险评级分析的决策表,利用粗糙集来减少决策表的属性和价值,资助引发所有利率风险的主要特征;然后将神经网络模型与分析相结合,避免国际承包商花更多的时间进行风险分析,据此我们可以决定是否投标以及投标成本。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号