首页> 外文会议>International Conference on Computer Science and Service System;CSSS 2012 >The Study of Enterprise Working Time Optimization Simulation System Considering the Peak-Valley Power Price
【24h】

The Study of Enterprise Working Time Optimization Simulation System Considering the Peak-Valley Power Price

机译:考虑峰谷电价的企业工作时间优化仿真系统研究

获取原文
获取外文期刊封面目录资料

摘要

The peak-valley time of use (TOU) power price is an effective demand side management measure which affects the power consumption way of the end-users via price mechanism. With the help of the peak-valley power price policy, an enterprise working time optimization and benefit analysis simulation system is designed and realized, which can guide the industrial users to optimize and adjust the work time reasonably in the condition of ensuring the total power consumption invariant. Firstly, the two most important constraint factors that influence the system design are analyzed. Then, the realization process of the simulation system is described detailedly. Finally, the system functions are verified by a case analysis. The results show that the system can assist the enterprise to reduce the electricity cost and support the power grid companies to realize the demand side management and peak load shaving through simulating the adjustment of the enterprise work time or the power consumption of a certain period for the simulation analysis the power consumption condition of the enterprise.
机译:高峰谷使用时间(TOU)电价是一种有效的需求侧管理措施,它通过价格机制影响最终用户的功耗方式。借助峰谷电价政策,设计并实现了企业工作时间优化和效益分析仿真系统,可以在保证总用电量的前提下,指导行业用户合理优化和调整工作时间。不变的首先,分析了影响系统设计的两个最重要的约束因素。然后,详细描述了仿真系统的实现过程。最后,通过案例分析验证了系统功能。结果表明,该系统通过模拟企业的工作时间调整或一定时间内的能耗调整,可以帮助企业降低用电成本,支持电网公司实现需求侧管理和调峰工作。仿真分析企业的用电情况。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号