A Note on Alternative Objectives for the Blocks Relocation Problem

机译:关于块搬迁问题的替代目标的注释

获取原文

摘要

The Blocks Relocation Problem (BRP) is an important problem arising at container terminals when containers have to be transshipped. Recently, we have seen the upcoming discussion whether some objectives are more appropriate than others. While most authors minimize the number of relocations as objective, some minimize the crane's working time. After adapting a given BRP formulation by including the second objective in two variants, a computational study is carried out on benchmark instances from literature applying some sensitivity analysis indicating to which extent optimal solutions change if the objective is replaced. If the number of relocations is minimized, often larger crane working times may be obtained. Conversely, if the crane working time is minimized, often solutions achieving also a minimum number of relocations are found. Based on our analysis, the consideration of alternative objectives like crane working time is recommended.
机译:当必须转运集装箱时,块重定位问题(BRP)是在集装箱码头出现的重要问题。最近,我们看到了即将进行的讨论,即某些目标是否比其他目标更合适。虽然大多数作者都尽量减少了搬迁的次数,但有些人却将起重机的工作时间减到最少。在通过将第二个目标包括在两个变体中来适应给定的BRP公式之后,对文献中的基准实例进行了计算研究,并应用了一些敏感性分析,指出如果替换目标,最优解决方案的变化程度。如果将重新安置的次数减至最少,则通常可以获得更长的起重机工作时间。相反,如果将起重机的工作时间减至最少,通常会找到实现最小数量的重新安置的解决方案。根据我们的分析,建议考虑其他目标,例如起重机的工作时间。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号