首页> 外文会议>International conference on cold regions engineering;Canadian permafrost conference >Construction-Wintertime Compaction and LNG Facilities in Fairbanks, Alaska
【24h】

Construction-Wintertime Compaction and LNG Facilities in Fairbanks, Alaska

机译:阿拉斯加费尔班克斯的建筑-冬季压实和液化天然气设施

获取原文

摘要

Numerous case studies are presented with regularity which show that compaction of soils during the winter is fraught with generally inadequate results. The LNG storage tank construction timeline provided very few options for excavation and backfill activities to occur in warmer months. Careful consideration was given to key parameters required for compaction during the winter in Fairbanks, where the average winter temperature is -15℃. Air temperature, wind, soil temperature, and moisture conditioning constraints were defined prior to the start of winter compaction efforts. Careful execution of the plan and attention to the weather and soil behavior allowed for a successful structural backfill compaction effort. The paper identifies the key parameters and discusses instances when conditions varied those parameters and how construction was impacted. Additional discussion is presented regarding the integration of other site work and construction activities at adjacent facilities.
机译:定期进行的大量案例研究表明,冬季土壤压实通常结果不充分。液化天然气储罐的建设时间表很少提供在温暖月份进行挖掘和回填活动的选择。仔细考虑了冬季平均温度为-15℃的费尔班克斯冬季压实所需的关键参数。在冬季压实工作开始之前,先定义了空气温度,风,土壤温度和湿度调节的限制条件。认真执行计划并注意天气和土壤行为,才能成功完成结构回填压实工作。本文确定了关键参数,并讨论了当条件改变这些参数以及如何影响构造时的实例。还提出了有关其他设施工作和邻近设施建设活动的整合的其他讨论。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号