Drainage Challenges in the Whapmagoostui First Nation Community: A Case Study

机译:Whapmagoostui原住民社区的排水挑战:案例研究

获取原文

摘要

The Cree Community of Whapmagoostui is facing serious runoff water management issues on its territory. During periods of heavy rain and during the snow-melting season, significant accumulation of runoff water in certain sectors of the community impedes pedestrian and vehicular traffic, in addition to causing damage to streets and buildings. Traffic areas become difficult and frequent interventions (levelling and surfacing) are required. Repeated levelling operations caused aggregate segregation and exacerbated the emergence of surface holes and depression. This situation worsened over the recent years as the effects of climate changes become more a reality. CIMA+ proposed and tested in 2016-2017 a simple concept using conventional detention plastic chambers to achieve water storage, at a first location in the elementary school yard. These chambers allow for water percolation but also for sand and particles sedimentation. After two years of service performance in the field, the system has proven efficient and has provided a practical solution adapted to the needs of the community. Due to the remoteness of the Whapmagoostui Community which has no terrestrial link to other southern communities, supplies and construction materials can only be sea or air lifted. The lightweight plastic detention chambers become a preferred component of the drainage system, relatively easily transported, stored, and put in place. One of the key elements of the success of this project is the implication of a local Cree workers crew that has been assembled by the public works department. The Cree workers and CIMA+ team learned to work together, to plan the work sequence, to secure the materials and equipment ahead of time, to prevent health and safety hazards, and to measure the importance of quality craftsmanship. The CIMA+ team will take a leadership role in the community as the construction work activities intensify in the near future.
机译:Whapmagoostui的Cree社区在其领土上面临着严重的径流水管理问题。在大雨期间和融雪季节,社区某些地区大量积存的径流水不仅阻碍行人和车辆通行,而且还破坏街道和建筑物。交通区域变得困难,需要频繁的干预(找平和铺面)。重复的找平操作导致骨料偏析并加剧了表面孔和凹陷的出现。近年来,随着气候变化的影响变得更加现实,这种情况恶化了。 CIMA +在2016-2017年提出并测试了一个简单的概念,该概念使用常规的拘留用塑料隔间在小学院子的第一个位置实现蓄水。这些腔室既可以使水渗滤,又可以使沙子和颗粒沉降。经过两年的现场服务表现,该系统已被证明是有效的,并提供了适合社区需求的实用解决方案。由于Whapmagoostui社区偏远,与其他南方社区没有地面联系,因此只能通过海上或空中运输物资和建筑材料。轻巧的塑料滞留室成为排水系统的首选组件,相对易于运输,存储和放置。该项目成功的关键要素之一是由公共工程部门召集了当地的Cree工人团队。 Cree工人和CIMA +团队学会了一起工作,计划工作顺序,提前保护材料和设备,预防健康和安全隐患以及衡量高质量工艺的重要性。随着近期施工活动的加强,CIMA +团队将在社区中发挥领导作用。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号