首页> 外文会议>Intelligent computing methodologies >Multiple-Crane Integrated Scheduling Problem with Flexible Group Decision in a Steelmaking Shop
【24h】

Multiple-Crane Integrated Scheduling Problem with Flexible Group Decision in a Steelmaking Shop

机译:炼钢车间具有柔性群决策的多起重机集成调度问题

获取原文
获取原文并翻译 | 示例

摘要

This paper abstracts a practical problem from the iron and steel enterprise, and researches a multiple crane integrated scheduling problem with flexible group decision (crane grouping scheduling for short). For this demonstrated NP-hard problem, we propose a heuristic algorithm based on some analyzed properties. For a restrict case, we analyze the worst-case performance. Further, for the general case, the average performance of the heuristic algorithm is computationally evaluated. The results show that the proposed heuristic algorithm is capable of generating good quality solutions.
机译:本文从钢铁企业中提炼出一个实际问题,并研究了具有柔性群决策的多起重机集成调度问题(简称起重机分组调度)。对于这个已证明的NP-hard问题,我们提出了一种基于分析属性的启发式算法。对于极限情况,我们分析了最坏情况下的性能。此外,对于一般情况,通过计算评估启发式算法的平均性能。结果表明,所提出的启发式算法能够生成高质量的解。

著录项

  • 来源
  • 会议地点 Liverpool(GB)
  • 作者

    Xie Xie; Yongyue Zheng;

  • 作者单位

    Key Laboratory of Manufacturing Industrial and Integrated Automation, Shenyang University, Shenyang, Liaoning, China;

    Liaoning Institute of Standardization, Shenyang, Liaoning, China;

  • 会议组织
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号