Estimation of tack-welding and welding cost during design of heavy earthmoving equipment

机译:重型土方工程设备设计中的点焊和焊接成本估算

获取原文
获取原文并翻译 | 示例

摘要

Cost estimation is important in Design for Manufacture. Cost can be used to quantify the manufacturability of a design. Cost estimation tools that relate manufacturing cost to design features must guid the designer in identifying cost critical aspects of a design. Heavy earthmoving equipment, such as dragline and front-end loader buckets, are peculiar products that require special consideration in formulating cost estimation models. This paper presents cost estimation models for two specific aspects of manufacturing this type of equipment, i.e. tack-welding (preliminary assembly) and welding (completing the assembly). The models focus on the time required to complete these operations and relate these times to design features. The paper proposes new models for the estimation of non-arc times, which are typically about 66
机译:成本估算在制造设计中很重要。成本可用于量化设计的可制造性。将制造成本与设计特征相关联的成本估算工具必须指导设计者确定设计的成本关键方面。吊斗铲和前端装载机铲斗等重型土方设备是特殊的产品,在制定成本估算模型时需要特别考虑。本文介绍了制造此类设备的两个特定方面的成本估算模型,即点焊(初步组装)和焊接(完成组装)。这些模型着重于完成这些操作所需的时间,并将这些时间与设计特征相关联。本文提出了用于估计非电弧时间的新模型,通常约为66

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号