【24h】

THE FOUR ROLES OF SCM IN CONSTRUCTION PROJECT

机译:供应链管理在建设项目中的四个作用

获取原文
获取原文并翻译 | 示例

摘要

It is argued that due to construction peculiarities, supply chain management has four special roles in construction project. Practical initiatives in each role to advance the construction supply chain are analyzed. The present status of construction supply chains is investigated by means of case studies and a comparison with previous research. Three main conclusions are drawn regarding the present status. Firstly, even in normal situations the construction supply chain has a large quantity of waste and problems. Secondly, most of these are caused in another stage of the construction supply chain than when detected. Thirdly, waste and problems are largely caused by obsolete, myopic control of the construction supply chain. These results concur with the findings made on make-to-order supply chains in general. Finally, the subjective and objective limitations of the four roles are analyzed, this being based on empirical findings and the generic theory of supply chain management.
机译:有人认为,由于建设的特殊性,供应链管理在建设项目中有四个特殊作用。分析了每个角色在推进建筑供应链方面的实际举措。通过案例研究和与以前的研究比较,研究了建筑供应链的现状。关于现状,得出了三个主要结论。首先,即使在正常情况下,建筑供应链也存在大量浪费和问题。其次,其中大多数是在建筑供应链的另一阶段而不是被发现时引起的。第三,浪费和问题很大程度上是由于对建筑供应链的过时近视控制所致。这些结果与按订单生产的供应链总体上的发现一致。最后,基于经验发现和供应链管理的一般理论,分析了这四个角色的主观和客观局限性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号