摘要

The Young-Rainey Science, Technology, andrnResearch (STAR) Center (formerly known as the PinellasrnSTAR Center) is a former U.S. Department of Energyrn(DOE) facility located in Largo, Florida.rnThe site was contaminated with organic solventsrnand arsenic used during the manufacture of neutronrngenerators and other devices for DOE. As a result ofrnhistoric waste disposal practices, contamination remainsrnin the subsurface. The facility was transferred to localrngovernment ownership in 1995, but DOE continues tornconduct groundwater remediation at the site.rnThe Northeast Site at the Young-Rainey STARrnCenter is one of four remaining active Solid WasternManagement Units (areas of contamination) that requirernremediation. Non-aqueous phase liquids (NAPLs) havernbeen identified in the subsurface at the Northeast Site.rnThese NAPLs are a source of groundwater contaminationrnthat may last for many years. Therefore, the source ofrnthe NAPLs must be addressed before remediation ofrndissolved-phase contamination can be completed.rnA plan was determined for an interim correctivernmeasure to remediate NAPLs at the Northeast Site. Anrninterim corrective measure is warranted because itrnsupports the long-term corrective action to remediate therndissolved-phase contamination in the surficial aquifer tornmaximum contaminant levels specified by the FloridarnDepartment of Environmental Protection for drinkingrnwater. Environmental restoration activities at the Young-rnRainey STAR Center are conducted under the oversightrnof the Florida Department of Environmental Protection asrndefined in the Hazardous and Solid Waste Amendmentsrnpermit.DOE and its contractor, MACTEC EnvironmentalrnRestoration Services, L.L.C., recognized that NAPLrntreatment technologies are generally new and innovativernand have been demonstrated only on a small scale. Arnsuccessful remediation effort would require aggressivernand expensive technology. The goal of the remediationrnplan was to research and select the remediation approachrnthat had the highest chance for success and to structure arnperformance-based subcontract that would limit risk forrnall parties.
机译:Young-Rainey科学,技术和研究(STAR)中心(以前称为PinellasrnSTAR中心)是位于佛罗里达州Largo的前美国能源部(DOE)设施。该场地受到制造过程中使用的有机溶剂和砷的污染。的中子发生器和其他用于能源部的设备。由于采取了历史性的废物处置方式,因此污染仍然存在于地下。该设施于1995年移交给地方政府所有,但DOE继续对该场地的地下水进行治理。Young-Rainey STARrn中心的东北场地是需要修复的四个剩余的现役固体废物管理单位(污染区域)之一。在东北地区的地下已经发现了非水相液体(NAPL)。这些NAPL是地下水污染的源头,可能会持续多年。因此,必须先解决NAPL的来源,然后才能完成对溶解相污染的补救。确定了一项针对东北站点NAPL的临时纠正措施的计划。采取临时纠正措施是有必要的,因为它支持长期纠正措施,以补救佛罗里达州环境保护署规定的饮用水中表层含水层中最大溶解度的溶解相污染。在Young-rnRainey STAR中心进行的环境修复活动是在《佛罗里达州环境保护与危险废物和固体废物修订许可证》中规定的监督下进行的。DOE及其承包商MACTEC EnvironmentalrnRestoration Services,LLC认识到NAPLrn处理技术通常是新的和创新的技术。仅在小规模展示。成功的补救工作将需要积极进取且昂贵的技术。补救计划的目标是研究和选择具有最大成功机会的补救方法,并构建基于不良绩效的分包合同,该合同将限制各方的风险。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号