首页> 外文会议>aEngineering tommorow's today! >The Heritage and Power of the Integrated PM/SEProject Cycle
【24h】

The Heritage and Power of the Integrated PM/SEProject Cycle

机译:PM / SEProject集成周期的传承与力量

获取原文
获取原文并翻译 | 示例

摘要

Organizations that successfully transition from ad-hoc work practices to a repeatable,rncontrolled process usually transition first to a project cycle and then to a gated project cycle tornmanage accomplishments.rnBy examining past and present project cycles, we can identify the primary concerns of thernindustries for which the cycles were designed. For example, project cycles of governmentrnprojects tend to be representations of the technical development or systems engineering (SE)rnprocess, while project cycles of commercial organizations tend to reflect the pursuit of thernbusiness case and project management (PM) approach. It is unusual to find fully integratedrnproject cycles that address both the business (PM) and technical aspects (SE) as an integratedrnprocess.rnFully integrated project cycles that reflect both project management and systems engineeringrnstrategic objectives and tactical approach should depict the three aspects of phased expectations:rnbusiness, budget, and technical. The business and budget aspects are highly project managementcentric,rnwhile the technical aspect reflects the systems engineering (solution development) cycle.rnThe three aspects must be constructed congruently and must remain congruent to ensure projectrnand system integrity and the associated high probability of success. Imbedded control gatesrnshould punctuate the cycle to focus development creativity on the elaboration of the technicalrnbaseline and satisfaction of the business case, which may be evolving over time due to marketrnforces independent of the evolving technical baseline.
机译:成功地从临时工作实践过渡到可重复的,受控流程的组织通常会先过渡到项目周期,然后再过渡到封闭的项目周期,从而破坏管理成就。通过检查过去和现在的项目周期,我们可以确定行业的主要关注点设计了哪些循环。例如,政府项目的项目周期倾向于代表技术开发或系统工程(SE)流程,而商业组织的项目周期倾向于反映对商业案例和项目管理(PM)方法的追求。找到作为业务流程综合处理业务(PM)和技术方面(SE)的完全集成的项目周期是不寻常的。反映项目管理和系统工程的完全集成的项目周期战略目标和战术方法应描述分阶段期望的三个方面:rn业务,预算和技术。业务和预算方面以项目管理为中心,而技术方面则反映了系统工程(解决方案开发)的周期。这三个方面必须结构一致,并且必须保持一致,以确保项目和系统完整性以及相关的高成功率。嵌入的控制门应该使周期更重要,从而使开发创造力专注于技术基线的制定和业务案例的满意度,由于市场力量独立于不断发展的技术基线,因此技术基线和满意度可能会随着时间而发展。

著录项

  • 来源
    《aEngineering tommorow's today!》|2003年|783-791|共9页
  • 会议地点 Arlington VA(US)
  • 作者单位

    Center for Systems Management, Inc.rn2325 Dulles Corner Blvd., Suite 670rnHerndon, VA 20171-3418rnwww.csm.comrn?CSM 2003;

    Center for Systems Management, Inc.rn2325 Dulles Corner Blvd., Suite 670rnHerndon, VA 20171-3418rnwww.csm.comrn?CSM 2003;

  • 会议组织
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 系统工程;
  • 关键词

  • 入库时间 2022-08-26 14:03:57

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号