首页> 外文会议>Electromagnetic Compatibility (APEMC), 2012 Asia-Pacific Symposium on >System power integrity impact by package power/ground balls assignment and decoupling capacitors
【24h】

System power integrity impact by package power/ground balls assignment and decoupling capacitors

机译:封装电源/接地球分配和去耦电容器对系统电源完整性的影响

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

Power integrity is one of the important issues of system design. Power and current levels are expected to increase with a corresponding to decrease in the voltage and increment of I/O number. Based on these factors, system designer faces the challenge on power delivery network. The power/ground (P/G) ball is often used as a link between the package and printed circuit board (PCB). It relates to the system power distribution from the voltage regulator module (VRM) to IC. When considering the power delivery network (PDN) design, power/ground balls position is the key point for complete power delivery. In this research, the assignment of the power/ground balls at different places and improvement of resonance impedance with different decoupling capacitors have been investigated for the impact of power integrity. The proposed arrangement of power/ground balls position is presented. The parasitic effects for different conditions of system design are extracted for comparison. The simulation results confirm with our theoretical analysis.
机译:电源完整性是系统设计的重要问题之一。功率和电流水平预计会随着电压的降低和I / O数量的增加而增加。基于这些因素,系统设计人员面临着供电网络的挑战。电源/接地(P / G)球通常用作封装和印刷电路板(PCB)之间的链接。它涉及从稳压器模块(VRM)到IC的系统功率分配。在考虑电源传输网络(PDN)设计时,电源/接地球的位置是完成电源传输的关键。在这项研究中,针对电源完整性的影响,已经研究了在不同位置分配电源/接地球以及使用不同的去耦电容器改善谐振阻抗的问题。提出了电源/接地球位置的建议布置。提取了在不同系统设计条件下的寄生效应,以进行比较。仿真结果与我们的理论分析相吻合。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号