首页> 外文会议>Electrical Engineering/Electronics, Computer, Telecommunications and Information Technology (ECTI-CON), 2012 9th International Conference on >An appropriate disconnecting time of distributed generation by optimal protection setting and transformer connection type
【24h】

An appropriate disconnecting time of distributed generation by optimal protection setting and transformer connection type

机译:通过最佳保护设置和变压器连接类型,适当的分布式发电断开时间

获取原文
获取原文并翻译 | 示例

摘要

This paper analyzes the impacts of Distributed Generation (DG) disconnecting time on utility and DG, especially the impact on utility reclosing time. The reclosing time is a temporary interval that a utility protective device is opened after a fault occurrence. Generally, DG must be disconnected before the end of this reclosing time. Mostly, DG may be requested to be disconnected after a fault occurrence instantaneously. However, the latest IEEE 1547.2 Interconnecting Standard recommends that DG shall remain connected in the system for a period of time. This standard causes both advantages and disadvantages for utility and DG. The remaining DG connecting time pay an important role to the consequent impacts on the connected network, especially protection system. Hence, an appropriate DG disconnecting time is investigated in this paper. The solution is achieved by setting Time Dial Setting (TDS), Pickup Current, Terminal Voltage of DG as well as the types of Transformer Connection with Genetic Algorithm (GA).
机译:本文分析了分布式发电(DG)断开时间对公用事业和DG的影响,尤其是对公用事业重合闸时间的影响。重合闸时间是故障发生后打开市电保护装置的临时间隔。通常,必须在此重合闸时间结束之前断开DG的连接。通常,在出现故障后,可能会要求DG断开连接。但是,最新的IEEE 1547.2互连标准建议DG在系统中保持连接一段时间。该标准对公用事业和危险品都有利弊。 DG剩余的连接时间对于由此对连接网络(尤其是保护系统)的影响起着重要作用。因此,本文研究了合适的DG断开时间。该解决方案通过设置时间拨号设置(TDS),启动电流,DG的端子电压以及采用遗传算法的变压器连接类型(GA)来实现。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号