The Ordsall Chord is a new railway link which for the first time connects all five of Manchester’srncity centre railway stations. It involves extensive and varied structures supporting nearly 700m ofrntrack, many of which are highly complex geometrically to satisfy architectural requirements.rnThe design across all engineering disciplines has been undertaken using extensive BuildingrnInformation Modelling (BIM). Federated 3d models produced by all disciplines are integrated in arncommon data environment, compliant with UK government BIM Level 2 requirements.rnThe level of detail developed for the civil and structural engineering design is unprecedented for arntransport infrastructure project in the north of England, with modelling in many cases down to thernlevel of every single nut, bolt, and reinforcement bar.rnEarly involvement of both the main contractor and steel fabrication subcontractor has allowedrnconventional roles and processes to be challenged. The design models and drawings have beenrnproduced for the designer by the steelwork subcontractor, although the structural designer stillrnowns these deliverables. For one structure, design drawings were eliminated and this structurernbuilt directly from the 3d model, prepared in collaboration between fabricator and designer.rnAdoption of these methodologies has supported successful delivery of structures with challengingrngeometric interfaces between steelwork, concrete, and existing brickwork arches. This hasrnreduced programme and safety risks during fabrication and installation. The way of working hasrnbeen enabled by specific procurement and contractual arrangements, including appointment onrndemonstration of collaborative behaviours.rnWe seek to identify ways where the approaches adopted on Ordsall Chord could be used on otherrnprojects, including those with different procurement and contractual arrangements. What are thernnecessary preconditions to simplifying the content and transmission of digital design information?rnWhat is required with regard to construction supply chain capabilities, particularly consideringrntraining, automation and the associated investment?rnWhat factors continue to hold us to conventional design deliverables (drawings) of a typernfundamentally unchanged for over two centuries? If we depart the 2d documentation worldrnentirely, what does this really mean for the designer, the contractor, and the eventual assetrnmaintainer?
机译:Ordsall和弦是一条新的铁路线,首次连接曼彻斯特市中心的所有五个火车站。它涉及支持近700m航迹的广泛多样的结构,其中许多几何形状非常复杂,无法满足建筑要求。rn所有工程学科的设计都是使用广泛的BuildingInformation Modeling(BIM)进行的。所有学科生成的联合3d模型都集成在arncommon数据环境中,符合英国政府的BIM Level 2要求。rn对于英格兰北部的arntransport基础设施项目,土木和结构工程设计开发的详细程度是空前的,其中建模在很多情况下,甚至每个螺母,螺栓和钢筋的水平都降低了。主要承包商和钢铁制造分包商的早期介入使常规角色和工艺受到挑战。钢铁分包商为设计师提供了设计模型和工程图,尽管结构设计师仍未提供这些交付成果。对于一个结构,消除了设计图纸,并直接从3d模型中构造并由制造商和设计师共同准备。通过采用这些方法,成功地交付了钢结构,混凝土和现有砖砌拱之间具有挑战性的几何界面的结构。这减少了制造和安装过程中的程序和安全风险。具体的采购和合同安排(包括合作行为任命的任命)已使工作方式成为可能。我们试图确定在Ordsall Chord上采用的方法可用于其他项目的方式,包括具有不同采购和合同安排的项目。简化数字设计信息的内容和传输的必要先决条件是什么?对建筑供应链能力(特别是考虑到培训,自动化和相关投资)有什么要求?在哪些因素继续使我们无法接受数字设计信息的常规设计交付物(图纸)在两个多世纪以来根本没有变化?如果我们连续离开2D文档,这对设计师,承包商和最终的资产维护者真正意味着什么?

著录项

  • 来源
    《Creativity and collaboration》|2017年|127-134|共8页
  • 会议地点
  • 作者

    Brian Duguid; Jason Hyde;

  • 作者单位

    AECOM Mott MacDonald JV, Altrincham,UK,brian.duguid@mottmac.com;

    AECOM Mott MacDonald JV, Altrincham, UK;

  • 会议组织
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号