首页> 外文会议>Computing, Measurement, Control and Sensor Network (CMCSN), 2012 International Conference on >The Large-Scale Nuclear Power Plant Achieve for Research Equipment for Production and Material Platform
【24h】

The Large-Scale Nuclear Power Plant Achieve for Research Equipment for Production and Material Platform

机译:大型核电站用于生产和材料平台的研究设备取得成果

获取原文
获取原文并翻译 | 示例

摘要

As the go as the vigorous development of Chinese nuclear power industry, nuclear power technology is increasingly mature. During Nuclear power plant construction preparation period, a large number of production materials need to be standardized and need professional management, which are still needing to be solved. This paper uses ECP system (take equipment management as the center of production materials platform, the taking Equipment management as the Center of production and goods Platform) to introduce a new management and utilization modes of modern production materials.
机译:随着中国核电产业的蓬勃发展,核电技术日益成熟。在核电厂建设准备阶段,大量生产材料需要规范化,需要专业的管理,这仍然需要解决。本文采用ECP系统(以设备管理为生产资料平台的中心,以设备管理为生产商品平台的中心),介绍了现代生产材料的一种新的管理和利用方式。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号