首页> 外文会议>Computers in railways XII: Computer system design and operation in railways and other transit systems >Linkage of a conventional line dispatch system with the Shinkansen dispatch system
【24h】

Linkage of a conventional line dispatch system with the Shinkansen dispatch system

机译:常规线路调度系统与新干线调度系统的链接

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

With the partial opening of the Shin-Yatsushiro to Kagoshima-Chuo section of the Kyushu Shinkansen in March 2004, management of the connection to the conventional line limited express trains at Shin-Yatsushiro Station. It became important to provide a service in the Hakata to Kagoshima-Chuo section that was comparable to that of the transport system up to then. For that reason, station facilities were made to enable transfers between the Shinkansen and conventional line trains at the same platform. In addition, linkage functions between the Shinkansen and conventional line dispatch systems were set up as follows. 1. Referencing of conventional line timetables when considering revised Shinkansen timetables 2. Adding conventional line connection management functions to the Shinkansen programmed route control 3. Adding conventional line occupation display to the Shinkansen line occupation display and route control monitor 4. Displaying the conventional line timetable (planned and actual) on the Shinkansen timetable display monitor 5. Sharing of operation information provision between the Shinkansen and conventional lines 6. Guidance of trains and operation, including information relating to conventional line train connections on indicators for passengers The work is supported by means such as allowing dispatchers to identify the timetable of the day for the other type of train system and the current train operation status.
机译:随着九州新干线的新八代至鹿儿岛中央段的部分通车,2004年3月,新八代站的常规线路特快列车的连接管理开始。在博多到鹿儿岛中央区提供的服务与当时的运输系统相当,这一点变得很重要。因此,为了在同一平台上进行新干线与传统线路列车之间的换乘而进行了车站设施建设。此外,新干线与常规线路调度系统之间的链接功能设置如下。 1.在考虑修订的新干线时间表时参考常规线路时间表2.将新线路连接管理功能添加到新干线编程路线控制中3.将常规线路占用显示添加到新干线线路占用显示和路线控制监视器中4.显示常规线路时间表在新干线时刻表显示监视器上(计划的和实际的)5.在新干线和常规线路之间共享运营信息提供6.火车和运营的指南,包括与常规线路列车相关的乘客指示信息的工作例如允许调度员确定其他类型的火车系统的每日时刻表以及当前的火车运行状态。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号