Planning and reality of the final verification and on-site assembly of KMOS for the VLT

机译:VLT的KMOS最终验证和现场组装的计划和现实

获取原文

摘要

The K band Multi Object Spectrograph (KMOS) instrument underwent its final European verification in the early part of 2012. It was then shipped to the Paranal Observatory where it was re-assembled, retested and then installed on one of the European Southern Observatory's (ESO) Very Large Telescope (VLT) unit telescopes ready for final commissioning tests at the end of 2012. The whole process required meticulous planning in order to minimise the risk of problems at Paranal and the associated disruption to the observatory operations. This paper discusses the planning process and compares what actually happened against the plans. The process was smooth and some reasons for this success are explored.
机译:K波段多目标光谱仪(KMOS)仪器于2012年初经过了欧洲的最终验证。然后将其运送到旁观台,在此进行了重新组装,重新测试,然后安装在欧洲南方天文台(ESO)的其中之一上。 )超大型望远镜(VLT)单位的望远镜准备在2012年底进行最终调试测试。整个过程需要精心计划,以最大程度地降低Paranal出现问题的风险以及对天文台运行造成的干扰。本文讨论了计划过程,并将实际发生的事情与计划进行了比较。整个过程很顺利,并探讨了成功的一些原因。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号