SEVERAL PROBLEMS ON DEMOLISHING THIRD PHASE RCC COFFERDAM OF THREE GORGES DAM PROJECTS BY BLASTING

机译:爆破拆除三峡大坝第三期碾压混凝土坝的几个问题

获取原文
获取原文并翻译 | 示例

摘要

Third phase cofferdam of Three Gorges Dam Projects is made of roll compact concrete (RCC). It is one of the longest cofferdams to be demolished in the world. And there is no example on demolishing it to use for reference. In this paper, a series of experimental results are presented. They include 1:36 model experiment with uniformity concrete, 1:15, 1:20 model experiment with layer concrete, 1:5 in situ experiments and an engineering test with RCC for blasting demolition. It is shown that the cofferdam overturn schedule is feasible. But if the charge position is not reasonable or designed by experience of rock blasting only, overturn schedule will be not realization. Some results are recorded by pictures and recording pictures. By analysis these results, it is given that there may be a time scale that plays an important role in blasting damaging structure and that both layer characteristic of RCC and deep water are important factor to blasting effective.
机译:三峡大坝工程的第三期围堰由碾压混凝土(RCC)制成。它是世界上待拆除的最长的围堰之一。并且没有拆卸它的例子供参考。本文提出了一系列实验结果。其中包括采用均质混凝土的1:36模型试验,采用层状混凝土的1:20模型试验,采用1:5现场试验和使用RCC进行爆破拆除的工程测试。结果表明,围堰翻转计划是可行的。但是,如果装药位置不合理或仅根据爆破经验来设计,则不会实现倾覆时间表。一些结果通过图片和录制图片记录。通过分析这些结果,可以得出在爆破破坏结构中可能发挥重要作用的时间尺度,而碾压混凝土和深水的层特性都是爆破效果的重要因素。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号