REPROCUREMENT CONSIDERATIONS FOR AN EXISTING MUNICIPALLY OWNED REFUSE-TO-ENERGY PLANT PINELLAS COUNTY, FLORIDA

机译:佛罗里达州皮内拉斯县现有的城市拥有的垃圾发电厂的回收注意事项

获取原文
获取原文并翻译 | 示例

摘要

On May 7, 2007, the operating agreement for the Pinellas County mass-burn resource recovery facility will expire. This contract, originally negotiated in the late 1970's is one of the first in the United States for the design, construction, operation and maintenance of a municipally owned refuse-to-energy facility, and thus is one of the first to expire. In late 2003, Pinellas County began the process to reprocure an operator for its resource recovery facility under the terms of a new long-term agreement. This paper discusses planning processes and reprocurement activities to date, including hiring a reprocurement consulting engineer; formation of the project team (Project Working Group and Project Oversight Committee); development of the project schedule; and, identification of the reprocurement approach (informal meetings with vendors, Request for Qualifications and Request for Proposals). The paper also addresses certain technical and contractual issues associated with contracting a 24-year old refuse-to-energy facility. Technical items considered are a modified approach to ash processing and metals recovery; whether or not to continue the WESPhix® ash treatment process; and the need for various capital improvements. Contractual matters include such items as ownership of spare parts; availability of operating documents and record drawings; transfer of proprietary licenses; and consideration of a transition agreement. Pinellas County's reprocurement is being designed with the primary goal of developing a process that is fair, open and competitive; and one that provides a level playing field for all interested proposers. The paper draws comparisons between the reprocurement methods and processes considered, with conclusions about why the final reprocurement approach was selected.
机译:Pinellas县大规模燃烧资源回收设施的运营协议将于2007年5月7日到期。该合同最初于1970年代后期谈判,是美国第一批设计,建造,运营和维护市政垃圾发电设施的合同,因此也是第一份到期的合同。 2003年下半年,Pinellas County开始根据新的长期协议的条款,重新安排运营商为其资源回收设施进行采购。本文讨论了迄今为止的计划流程和回购活动,包括聘用了回购咨询工程师;组建项目团队(项目工作组和项目监督委员会);制定项目进度表;确定采购方法(与供应商的非正式会议,资格要求和建议书)。该文件还讨论了与签定24年历史的垃圾发电设施有关的某些技术和合同问题。所考虑的技术项目是灰处理和金属回收的改良方法;是否继续WESPhix®灰分处理过程;以及各种资本改进的需求。合同事项包括零件所有权等项目;提供操作文件和记录图;专有许可证的转让;并考虑过渡协议。皮涅拉斯县的采购流程的主要目标是开发一种公平,开放和竞争的程序。并为所有感兴趣的提议者提供一个公平的竞争环境。本文对再采购方法和所考虑的流程进行了比较,并得出了为什么选择最终再采购方法的结论。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号