New Danieli Slab Casters in Operation in ARCELORMITTAL Dunkerque and Fos sur Mer Sites (France)

机译:在ARCELORMITTAL Dunkerque和Fos sur Mer站点(法国)投入运营的新型Danieli平板脚轮

获取原文
获取原文并翻译 | 示例

摘要

The world largest steel produced, entered since 2004 a comprehensive renovation program aiming at the complete rebuilt of its largest slab casting complexes in EUROPE located in Dunkerque (Northern France) and Fos sur Mer (Southern France). Danieli has been identified as its technological partner for this renovation plan, one of the largest projects ever established, involving the reconstruction of slab casters covering an overall productivity of almost 10 million tons per year of slabs.The overall program involves the complete rebuilt of 4 two strand slab casters, 3 in Dunkerque and one in Fos-sur-Mer in a step by step bases: already 3 casters have successfully put into operation, while the last one is expected to be started up at the beginning of 2009. The goal of this challenging program is to enhance slab quality e improve production cost competitiveness, thanks to the complete redesign of the casters, maintenance free oriented, and the application state of the art technologies.The Dankerque site has been confirmed as one of the most reliable and sound, by achieving in the shortest time the full production and by reaching step-by-step the quality target of the final product. This was accomplished for the CC23 and it is on going for the CC22.The design approach for the CC1 in Fos sur Mer has been done according to the modern engineering techniques. According to the modern FMDSE analysis the technical risks have been identified in advance and the design has been improved directly during the engineering. RAMS analysis (Reliability-Availability-Maintainability-Safety) has been carried out all along the engineering stage, resulting in a design accomplishing a total calculated availability for the new caster of 98.9%.This paper describes the main features of the new casters as well as the main results already reached by the casters in operation.
机译:自2004年以来,全球产量最大的钢材进入了一项全面的翻新计划,旨在彻底重建位于敦刻尔克(法国北部)和福斯河畔梅尔(法国南部)的欧洲最大的板坯连铸厂。达涅利已被确定为这项翻新计划的技术合作伙伴,这是有史以来规模最大的项目之一,涉及板坯连铸机的改造,覆盖了每年近1000万吨的板坯整体生产能力。分两个步骤生产了2台板坯连铸机,其中有3台位于敦刻尔克(Dunkerque),有1台位于滨海福斯(Fos-sur-Mer):已经成功投产了3台连铸机,而最后一台则预计在2009年初投入使用。这个具有挑战性的计划的目的是提高板坯质量,提高生产成本的竞争力,这要归功于连铸机的全面重新设计,免维护的导向以及最先进的应用技术。Dankerque工地已被确认为最可靠和可靠的生产基地之一。通过在最短的时间内实现完整生产并逐步达到最终产品的质量目标来实现良好的音质。 CC23已完成此工作,CC22正在进行中。根据现代工程技术,完成了位于Fos sur Mer的CC1的设计方法。根据现代FMDSE分析,已经预先确定了技术风险,并且在工程过程中直接改进了设计。在整个工程阶段都进行了RAMS分析(可靠性-可用性-维护性-安全性),从而使新脚轮的设计总可用率达到98.9%。本文还介绍了新脚轮的主要特征作为运营中的脚轮已经达到的主要结果。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号