首页> 外文会议>2016 International Conference on Electrical Power and Energy Systems >Real power loss reduction in distribution network through Distributed Generation integration by implementing SPSO
【24h】

Real power loss reduction in distribution network through Distributed Generation integration by implementing SPSO

机译:通过实施SPSO,通过分布式发电集成降低配电网络的实际功率损耗

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

Renewable sources based Distributed Generation (DG) are placed in the vicinity of either customers or the load centers with the intention of minimization of the network power losses, improve voltage profile and recover substation capacity delivery. Thus, while placing DG units caution has to be taken so as to maximize the benefits. The current work presented in this paper describes several techniques to get optimal siting of DG units and their preliminary sizes to reduce power loss that enhance the reliability of power distribution system. Optimal sizing of DG is carried out using PSO and SPSO with arbitrarily generation of DG sizes. Here, objective function is taken to reduce the real losses of distribution network. An analysis of system operation has been done on IEEE-12 and 33 test systems and results obtained express the efficiency of proposed approaches. The distinct approaches have been implemented on standard networks in MATLAB®, in which SPSO diminishes real power losses up to 49.587 for 12-bus network while 48.09% for 33-bus network.
机译:基于可再生能源的分布式发电(DG)被放置在客户或负载中心附近,目的是最大程度地降低网络功率损耗,改善电压分布并恢复变电站的容量交付。因此,在放置DG装置时,必须谨慎行事,以使收益最大化。本文介绍的当前工作描述了几种获得DG机组最佳选址的技术及其初步尺寸,以减少功率损耗,从而增强了配电系统的可靠性。 DG的最佳尺寸确定是使用PSO和SPSO任意生成DG大小来进行的。在此,采用目标函数来减少配电网络的实际损失。已经对IEEE-12和33测试系统进行了系统操作分析,获得的结果表明了所提出方法的效率。独特的方法已在MATLAB®的标准网络上实现,其中SPSO减少了12总线网络的实际功率损耗高达49.587,而33总线网络的实际功率损耗则降低了48.09%。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号