首页> 外文会议>2014 International Conference on Power System Technology: Towards Green, Efficient and Smart Power System >Comprehensive decision-making of power grid DC de-icing plan based on equivalent net-ability method
【24h】

Comprehensive decision-making of power grid DC de-icing plan based on equivalent net-ability method

机译:基于等效网络法的电网直流除冰计划综合决策

获取原文
获取外文期刊封面目录资料

摘要

When the power grid suffers a wide range of freezing disasters, how to make a reasonable DC de-icing plan of transmission line became a urgent problem for the dispatchers. For the reason the DC de-icing ranking evaluating indicator of transmission line and the comprehensive index on net-ability drop are proposed to develop the power grid DC de-icing plan. The DC de-icing ranking evaluating indicator of transmission line is proposed to distinguish DC de-icing urgency of transmission lines. The importance of transmission line, the current rate of icing-coating and the predicted rate of icing-coating are the three attribute factors of the evaluating indicator, the weights of which are determined by the method of weighted average combinative evaluation. The comprehensive index on net-ability drop is used to reflect the system security. The transmission line DC de-icing group which would pose a serious threat to system security will not appear if planning the power grid DC de-icing plan based on the proposed equivalent net-ability method. DC de-icing comprehensive decision-making method of power grid is proposed with overall consideration of the emergence of transmission line DC de-icing and the power system security, the effectiveness and feasibility of which are demonstrated by the example of Guizhou power grid. The DC de-icing comprehensive decision-making method of power grid would be a good reference for the dispatcher to make DC de-icing plan g.
机译:当电网遭受广泛的冰冻灾害时,如何制定合理的输电线路直流除冰方案成为调度人员的当务之急。为此,提出了输电线路直流除冰等级评价指标和净降额的综合指标,以制定电网直流除冰方案。提出了输电线路直流除冰等级评价指标,以区分输电线路直流除冰的紧迫性。传输线的重要性,当前的覆冰率和预测的覆冰率是评估指标的三个属性因素,其权重由加权平均组合评估方法确定。网络容量下降的综合指标用来反映系统的安全性。如果基于提议的等效净容量方法来规划电网直流除冰计划,那么不会对系统安全造成严重威胁的输电线路直流除冰组不会出现。在综合考虑输电线路直流除冰和电力系统安全性的基础上,提出了一种电网直流除冰的综合决策方法,并以贵州电网为例,论证了其有效性和可行性。电网直流除冰综合决策方法为调度员制定直流除冰方案g提供了很好的参考。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号