首页> 外国专利> URBAN RAIL TRANSIT TRAIN OPERATION METHOD

URBAN RAIL TRANSIT TRAIN OPERATION METHOD

机译:城市轨道运输列车运行方法

摘要

An urban rail transit train (T1-T3, U1-U4, V1-V4, W1-W3, L) operation method, which is suitable for lines having a combined area in a station platform and which relates to the field of rail transit. Train A and train B exist in a certain approaching area section (01.1, 01.2, 01.3, 02.1, 03.1, 3.3, 4.1, 4.2) within a combined area in a platform of a certain station. The number of grouped cars of trains A and B may be the same or different. When train A stops, trains (T1-T3, U1-U4, V1-V4, W1-W3, L) face train A within the entire length range of the approaching area (01.1, 01.2, 01.3, 02.1, 03.1, 3.3, 4.1, 4.2), and doors are opened to allow passengers to board and/or disembark. When train B stops, no doors of the cars face the approaching area (01.1, 01.2, 01.3, 02.1, 03.1, 3.3, 4.1, 4.2), and there are naturally no passengers boarding and/or disembarking. One operation cycle consists of several trips by trains (T1-T3, U1-U4, V1-V4, W1-W3, L), and the cycle comprises at least one trip by train A and at least one trip by train B.
机译:城市轨道交通列车(T1-T3,U1-U4,V1-V4,W1-V4,L)操作方法,其适用于具有站平台中的组合区域的线,涉及轨道传输领域。火车A和火车B存在于特定站的平台的组合区域内的某个接近区域部分(01.1,01.2,01.3,02.1,4.1,4.1,4.2)。列车A和B的分组车辆数量可以是相同或不同的。当驾驶停止时,在接近区域的整个长度范围内(01.1,01.2,01.3,02.1,03.1,3.3,所述火车(T1-T3,U1-U4,V1-V4,W1-W3,L)面部列车A面部列车A的面部列车A 4.1,4.2)和门打开,允许乘客登上和/或下船。当火车B停止时,车的门不得面对接近区域(01.1,01.2,01.3,02.1,03.1,3.3,4.1,4.2),并且自然没有乘客登机和/或下船。一个操作周期由训练(T1-T3,U1-U4,V1-V4,W1-V4,L)组成,并且该循环包括乘火车A和至少一次乘火车B的跳闸。

著录项

  • 公开/公告号WO2021047129A1

    专利类型

  • 公开/公告日2021-03-18

    原文格式PDF

  • 申请/专利权人 WANG ZHE;

    申请/专利号WO2020CN00222

  • 发明设计人 WANG ZHE;

    申请日2020-09-14

  • 分类号B61B1;

  • 国家 CN

  • 入库时间 2022-08-24 17:49:35

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号