首页> 外国专利> Method for the distribution of the mooring system for mooring lines and connection of the mooring system for mooring lines of floating marine structure.The method of mooring floating marine structure, method for establishing a connection to the mooring line operable.The mooring system operable by means of an ROV for mooring of floating object for a device for anchor located at the bottom of the ocean and the mooring system for floating marine structuresThe mooring.

Method for the distribution of the mooring system for mooring lines and connection of the mooring system for mooring lines of floating marine structure.The method of mooring floating marine structure, method for establishing a connection to the mooring line operable.The mooring system operable by means of an ROV for mooring of floating object for a device for anchor located at the bottom of the ocean and the mooring system for floating marine structuresThe mooring.

机译:浮动海上结构的系泊系统的分配方法和系泊系统的连接方法。浮动海上结构的系泊方法,与可操作的系泊缆线建立连接的方法。可通过以下方式操作的系泊系统用于定位位于海洋底部的锚定装置的浮动物体的ROV的示意图以及用于浮动海洋结构的系泊系统。

摘要

Method for the distribution of the mooring system for mooring lines and connection of the mooring system for mooring lines of floating marine structure.The method of mooring floating marine structure, method for establishing a connection to the mooring line operable.The mooring system operable by means of an ROV for mooring of floating object for a device for anchor located at the bottom of the ocean and the mooring system for floating marine structuresThe mooring. Method for distribution of mooring systems for floating offshore structures, such as drilling rigs Costa's furniture (m.o.d.u.'s) and for connecting the same to its line of mooring.A single vessel maintenance of anchor contains one or more anchors, and each one has a connection to distribution and connection of mooring.The craft of maintenance of anchor moves an anchor around the cylinder and rear down the same to the bottom of the sea for installation.A line of maintenance is disconnected by the ROV of the connection of distribution and is moved to the connection of the mooring mooring line to become the main.The buoys are then mounted on the mooring line main to raise the same above the bottom of the sea for recovery.When the positioning of the modu is desired, the craft of maintenance of anchor recovers the buoy and its mooring line connects to the mooring line of the probe.With the use of the short section of mooring chain.A blocking device capture in the form of J is then installed on the mooring rope and is connected to the mooring line probe for a short section of chain.The retainer in the form of a j put the rope mooring, completing the connection between the anchor and mooring modu.A plurality of mooring ropes, usually a number eight, is distributed in this way for properly positioning a drilling unit coast around mobile.The disconnection of the modu is performed essentially by means of a procedure contrary to the procedure of distribution above.
机译:浮动海上结构的系泊系统的分配方法和系泊系统的连接方法。浮动海上结构的系泊方法,与可操作的系泊缆线建立连接的方法。可通过以下方式操作的系泊系统用于位于海洋底部的锚定装置的,用于漂浮物体的系泊的ROV和用于漂浮海洋结构的系泊系统。分配海上浮动结构(例如钻机)的系泊系统的方法,以及将科斯塔家具(modu's)连接到系泊设备的方法。单个船锚的维护包括一个或多个锚,每个锚都有一个连接到配电装置和系泊装置。锚固件的维护工艺将锚固件绕圆柱体移动,并向后向下移动到海底进行安装。维护线路被配电系统连接的ROV断开,并且将浮标移至系泊缆绳的连接处成为主要组件,然后将浮标安装在系泊缆绳的主要组件上,以将其抬高到海底上方以进行恢复。当需要将模块定位时,进行维护锚的作用是将浮标收回,其系泊缆线连接到探头的系泊缆线。利用系泊链的短段,然后安装J形式的阻塞装置d固定在系泊绳上,并与系链短段的系泊缆线探头连接。aj形式的固定器将绳索系泊,从而完成锚固件和系泊模块之间的连接。多根系泊绳通常为编号八,以这种方式分配,以适当地将钻探单元定位在移动台附近。模的断开基本上是通过与上述分配过程相反的过程进行的。

著录项

  • 公开/公告号BR9910349A

    专利类型

  • 公开/公告日2002-07-16

    原文格式PDF

  • 申请/专利权人 DELMAR SYSTEMS INC.;

    申请/专利号BR19999910349

  • 发明设计人 BILLY J. BERGERON;

    申请日1999-03-26

  • 分类号E02D7/00;

  • 国家 BR

  • 入库时间 2022-08-22 00:45:55

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号