首页> 外国专利> METHOD OF OPTIMIZATION OF DEVELOPMENT AND INCREASE OF PRODUCTIVITY OF OIL AND OIL-GAS DEPOSITS

METHOD OF OPTIMIZATION OF DEVELOPMENT AND INCREASE OF PRODUCTIVITY OF OIL AND OIL-GAS DEPOSITS

机译:优化开发和提高油气产量的方法

摘要

FIELD: development of oil and oil-gas deposits with electrical stimulation of producing wells for increase of oil stimulation of producing wells for increase of oil recovery from producing formations. SUBSTANCE: method includes pumping out of fluid from producing formations through producing wells and stimulation of formation with pulse current of different polarities for not more than 30h with pulse duration of 0.01-1s and pulse duration ratio of at least 2 with supplied power through two treated wells up to 500kW. Selected first for electrical treatment are deposits with maximum quantity of wells featuring the highest level of water cutting of produced fluid. First of all on this deposit, subject to treatment are wells with high level of water encroachment not reaching the planned oil recovery coefficient. Selected for treatment from these wells are wells with high fluid producing rate. In this case, at least, one producing well with low water cutting of produced fluid shall be located nearer to injection well than selected for each next electrical treatment. Similar procedure is used in selection and electrical treatment of wells of the second and next turns, in each next of which limit water encroachment level may be reached later. Electrical treatment on selected deposit is carried out until relative quantity of wells attaining maximum high level of water cutting of produced fluid becomes lower than on one of other deposits, to which then process of electrical treatment is transferred and carried out using the offered procedure. EFFECT: increased productivity of oil and oil-gas deposits. 1 dwg
机译:领域:利用生产井的电刺激以增加生产井的油刺激以增加从生产地层中采油的石油和油气沉积的开发。实质:方法包括通过生产井从生产地层中抽出流体,并用不同极性的脉冲电流在不超过30h的情况下刺激地层,脉冲持续时间为0.01-1s,脉冲持续时间比率为至少2,并通过两次处理提供电源高达500kW的水井。首先选择进行电处理的是具有最大产量的含水层,其中产出水的含水率最高。首先,在该矿床上,要进行处理的是水侵量高且未达到计划的采油系数的井。从这些井中选择用于处理的是具有高产液率的井。在这种情况下,至少要有一个产水率低的采油井,而不是为每个下一次电处理选择​​的采油井。在第二回合和下一回合的井的选择和电气处理中使用类似的程序,在每个下一回合的井中,稍后可能会达到极限水浸入水平。对选定的沉积物进行电气处理,直到达到最大高产水含水率的井的相对数量变得比其他沉积物之一低为止,然后将其进行电处理并使用提供的程序进行处理。效果:提高了石油和油气沉积物的生产率。 1载重吨

著录项

  • 公开/公告号RU2209301C1

    专利类型

  • 公开/公告日2003-07-27

    原文格式PDF

  • 申请/专利权人 RYBAKOV ALEKSANDR DMITRIEVICH;

    申请/专利号RU20010133787

  • 发明设计人 RYBAKOV A.D.;

    申请日2001-12-18

  • 分类号E21B43/16;

  • 国家 RU

  • 入库时间 2022-08-21 23:43:40

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号