SHAFT CONSTRUCTION METHOD, WATER CUT-OFF MEMBER OF STEEL SHEET PILE AND PRESS-IN METHOD OF STEEL SHEET PILE

机译:竖井施工方法,钢片桩止水构件及钢片桩压入法

摘要

PROBLEM TO BE SOLVED: To provide an inexpensive shaft construction method for dispensing with ground improvement by injection of chemicals, without opening the natural ground in a shaft, even if a steel sheet pile is cut.;SOLUTION: This shaft construction method constructs the shaft by pressing a plurality of steel sheet piles 1, and 1A to 1C in parallel in the ground surface G. Covers 2A to 2C cuttable on a natural ground side surface of the steel sheet piles 1A to 1C by a tunnel excavator T, are installed by covering a part being a passing port 18 of the excavator T. The steel sheet piles 1A to 1C for installing the covers 2A to 2C are pressed in the ground surface G, and a shaft space 13 is formed by removing sediment of a shaft side surface of the steel sheet pile 1A to 1C. The passing port 18 is opened in the steel sheet piles 1A to 1C by annularly cutting a part opposed to the covers 2A to 2C of the steel sheet piles 1A to 1C in the shaft space 13, and is supported by covering the natural ground of a passing port 18 part with the covers 2A to 2C. The covers 2A to 2C are cut when the tunnel excavator T passes through the passing port 18.;COPYRIGHT: (C)2007,JPO&INPIT
机译:解决的问题:提供一种廉价的轴构造方法,即使通过切割钢板桩,也无需注入自然的地面,即可通过注入化学药剂来改善地面状况;解决方案:这种轴构造方法可构造轴通过在地面G上平行地挤压多个钢板桩1和1A至1C。通过隧道挖掘机T在钢板桩1A至1C的自然地面侧表面上可切割的盖2A至2C被安装为:盖2A〜2C的设置用钢板桩1A〜1C被压入地面G,通过除去轴侧面的沉淀而形成轴空间13。钢板桩1A〜1C的截面图。通过在竖井空间13中环形切割与钢板桩1A至1C的盖2A至2C相对的部分而在钢板桩1A至1C中打开通孔18,并且通孔18被覆盖以覆盖钢板18的自然地面。带盖2A至2C的通孔18部分。当隧道挖掘机T通过通过口18时,切开了盖板2A至2C;版权所有:(C)2007,JPO&INPIT

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号