首页> 外国专利> Bridge lining renewal method, involves roughening concrete layer by high-pressure water jet or by fine milling, applying mat reinforcement on roughened concrete layer, and applying new pavement on bridge

Bridge lining renewal method, involves roughening concrete layer by high-pressure water jet or by fine milling, applying mat reinforcement on roughened concrete layer, and applying new pavement on bridge

机译:桥梁衬砌更新方法包括:通过高压水射流或精细研磨使混凝土层变粗糙,在粗糙的混凝土层上施加垫层加固,并在桥梁上施加新的路面

摘要

The method involves removing an existing covering and/or an existing lining applied on a concrete layer (4). The concrete layer is roughened by a high-pressure water jet or by fine milling, and a mat reinforcement (3) is applied on the roughened concrete layer, where an adhesive strength of about 2 Newton per square mm is produced between the mat reinforcement and the mat reinforcement by roughening the concrete layer. A new pavement (2) is applied on the bridge, where the mat reinforcement is applied on the roughened concrete layer without a primer.
机译:该方法包括去除施加在混凝土层(4)上的现有覆盖物和/或现有衬里。通过高压水射流或精细研磨将混凝土层粗糙化,并在粗糙的混凝土层上施加毡垫增强层(3),在毡垫增强层和混凝土之间会产生约2牛顿/平方毫米的粘合强度。通过使混凝土层变粗糙来加强垫层。在桥上铺上新的路面(2),在没有底漆的情况下,将垫层钢筋涂在粗糙的混凝土层上。

著录项

相似文献

  • 专利
  • 外文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号