首页>
外国专利>
AUXILIARY FIXATION TOOL FOR SLOPE PROTECTION WALL MATERIAL INSTALLATION AND SLOPE PROTECTION WALL MATERIAL INSTALLATION AND FIXATION METHOD
AUXILIARY FIXATION TOOL FOR SLOPE PROTECTION WALL MATERIAL INSTALLATION AND SLOPE PROTECTION WALL MATERIAL INSTALLATION AND FIXATION METHOD
展开▼
机译:边坡防护墙材料安装的辅助固定工具及边坡防护墙材料的安装和固定方法
展开▼
页面导航
摘要
著录项
相似文献
摘要
PROBLEM TO BE SOLVED: To efficiently construct a protection wall at suppressed cost even when a slope has unevenness.;SOLUTION: When a wall material 301 is laid on the slope, a hooked part 111 which is one of holes formed in both ends of an auxiliary fixation tool 101 for slope protection wall material installation is hooked to a hook part 311 of the wall material 301, the auxiliary fixation tool 101 for slope protection wall material installation is swung up and down, and to the right and left around the hook part 311 as a fulcrum to move its engagement part 121 to a bottom position of a hollowed part B suitable for driving of a pile material 201, and the pile material 201 is driven in the engagement part 121 at the movement position substantially perpendicular to the slope while having a head 221 engaged with the engagement part 121 to bury a pile part 211 in the ground below the slop, so that the wall material 301 is efficiently load on even the slope having the scattered hollowed parts B.;COPYRIGHT: (C)2012,JPO&INPIT
展开▼
机译:解决的问题:即使在斜坡不平整的情况下,也能以抑制的成本有效地构造防护墙。解决方案:当在斜坡上铺设墙壁材料301时,钩状部分111是在孔的两端形成的孔之一。将用于斜坡保护墙材料安装的辅助固定工具101钩在壁材301的钩部311上,将用于斜坡保护墙材料安装的辅助固定工具101绕钩部上下左右摆动。 311作为支点,以使其接合部121移动至适于打桩材料201的中空部B的底部位置,并且在接合部121中,在与倾斜方向大致垂直的移动位置处驱动桩材料201。具有头部221,头部221与接合部121接合,以将桩部211埋在斜坡下方的地面中,从而即使在具有凹陷的空心p的斜坡上,壁材301也有效地装载。 arts B .;版权:(C)2012,JPO&INPIT
展开▼