首页>
外国专利>
Operation system of a complex heat treatment of urban resu00ecduos through plasma reactor, power generation by the CDM (clean development mechanism)
Operation system of a complex heat treatment of urban resu00ecduos through plasma reactor, power generation by the CDM (clean development mechanism)
展开▼
机译:通过等离子体反应器对城市水库进行复杂热处理的操作系统,通过CDM(清洁发展机制)发电
展开▼
页面导航
摘要
著录项
相似文献
摘要
Operation system of a complex heat treatment of urban resu00ecduos through plasma reactor, power generation by the CDM (clean development mechanism); utility model patent aims at a model of complex heat treatment of resu00ed Urban waste, through the plasma reactor process (CDM)Where the waste shall be type approved in the gap of receipt (01). Without previous separation; two clips type hydraulic hopper (polyP) (32); feed the plasma reactor (02): attached camera, post combustor (03). The chamber of the boiler of interconnected energy recovery (04); the gases generated in the chamber of the boiler (04) are sent for treatment in the scrubber (06).The basic gas scrubbers (07). Acids (08). Activated carbon filter (09), filter, selective catalytic reduction (10), exhaust gas (11) and a chimney gases (12): will be pumped effluent from the scrubber (06.The basic gas scrubbers (07), acids (08) to the system of liquid effluents treatment of the complex, which consists of the tank suitability (21), coagulation and flocculation (22). The primary separator (23), reservation and adensador sludge (24). The unit of sludge dewatering by centrifuge (25), a filter unit (26). Ultra filtration unit (27), parshal rail (28).Water treatment station (ETA) (29), desmineralizador (30), a treated water reservoir (20) and a reservoir of raw water (31), but if the cycle of treatment of contaminant that may exist in vapor effluent out of the system; the steam generated in the boiler (0 4) will supply and move the turbo generator (15).Producing energy at a voltage of 13.8 kV, interconnected to a 69 kV substation (13); the steam generated in the boiler (04) is passed through a steam turbines (15), to produce 12 MW / h of electric energy for every 500 tonldia waste.With the turbo generators with an installed capacity 14.60 MW / h; all these equipment controlled through an efficient and modern supervisory control center (15); the complex thermal treatment of municipal waste, through the plasma reactor process (CDM) is efetivamen You in an integrated center for the processing of municipal waste to energy cogeneration.
展开▼