首页>
外国专利>
Railway sleeper stabilization method for railway sleeper, involves incorporating resin comprising two components in fissure, where fissure is filled and closed, and resin is incorporated in fissure by filling element
Railway sleeper stabilization method for railway sleeper, involves incorporating resin comprising two components in fissure, where fissure is filled and closed, and resin is incorporated in fissure by filling element
The railway sleeper stabilization method involves incorporating a resin comprising two components in a fissure (10), where the fissure is filled and closed. The incorporation in the concrete sleeper takes place at a low pressure of 0.1 to 2.6 bars or in a pressure-free state. The cybernetic control of the pressure is carried out by a cybernetic control loop. A filling element is inserted in the fissure, and the fissure is covered. The resin is incorporated in the fissure by the filling element. An independent claim is included for a filling element, which is formed as a clamping pin and has a pipe.
展开▼