首页> 外国专利> Methods and System for Verb-Based Project Management

Methods and System for Verb-Based Project Management

机译:基于动词的项目管理方法和系统

摘要

In a system and methods for verb-based project management, a matter budget is built bottom-up from verb-based task templates. Phases, either newly-defined or selected from previously-defined phases are specified. Tasks, also either newly-defined or selected from pre-existing templates are specified. One or more activities are associated to each task and tasks are associated to phases. A task template specifies the amount of time allocated, employees or employee classes, background required and cost and profit. As the budget is built, a project checklist is automatically generated that closely tracks the budget, thus tightly linking budget and activities, leading to greater budget transparency and tighter cost control for a matter. Experience incurred is tracked for each timekeeper and associated to matter metadata to facilitate management of human capital for present and future matters. Embodiments may combine bottom-up and top-down budgeting approaches.
机译:在基于动词的项目管理的系统和方法中,物质预算是从基于动词的任务模板自底向上构建的。指定了新定义的阶段或从先前定义的阶段中选择的阶段。指定任务,无论是新定义的任务还是从现有模板中选择的任务。一个或多个活动与每个任务关联,并且任务与阶段关联。任务模板指定分配的时间量,员工或员工类别,所需的背景以及成本和利润。在建立预算时,会自动生成一个项目清单,该清单密切跟踪预算,从而将预算和活动紧密地联系在一起,从而提高了预算的透明度,并加强了对问题的成本控制。跟踪每个计时员产生的经验,并将其与物质元数据相关联,以促进对当前和未来物质的人力资本管理。实施例可以结合自下而上和自上而下的预算方法。

著录项

  • 公开/公告号US2015286974A1

    专利类型

  • 公开/公告日2015-10-08

    原文格式PDF

  • 申请/专利权人 PROSPEROWARE LLC;

    申请/专利号US201514671596

  • 发明设计人 L. KEITH LIPMAN;

    申请日2015-03-27

  • 分类号G06Q10/06;G06F17/30;

  • 国家 US

  • 入库时间 2022-08-21 15:23:08

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号