首页> 外国专利> How to build a composite foundation pile and composite foundation pile

How to build a composite foundation pile and composite foundation pile

机译:如何建造复合地基桩和复合地基桩

摘要

PROBLEM TO BE SOLVED: To make a combined footing pile effectively efficacious by sufficiently securing the joint strength of a joint part between a steel pipe pile constituting the combined footing pile and a cast-in-place pile.;SOLUTION: There is provided a combined footing pile 10 formed by uniting a steel pipe pile 20 and a cast-in-place pile 30 prepared therebelow. The cast-in-place pile 30 has a node part 34 formed to partially have an increased pile diameter, a joint steel pipe 40 is inserted into the steel pipe pile 20 from its lower end, and concrete is charged in the joint steel pipe 40 and between the joint steel pipe 40 and steel pipe pile 20.;COPYRIGHT: (C)2013,JPO&INPIT
机译:解决的问题:通过充分确保构成该桩脚桩的钢管桩与现浇桩之间的接合部的接合强度,从而使桩脚桩有效地有效。通过将钢管桩20和在其下方准备的现浇桩30结合而形成的立桩10。现浇桩30具有形成为部分地具有增大的桩直径的节点部分34,将接头钢管40从其下端插入钢管桩20,并且将混凝土填充到接头钢管40中。并在接头钢管40和钢管桩20之间;版权所有:(C)2013,JPO&INPIT

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号