首页> 外国专利> - H Abutment integrated with H-pile in integral abutment bridge and Constructing method thereof

- H Abutment integrated with H-pile in integral abutment bridge and Constructing method thereof

机译:-一体式桥台中与H型桩集成的H型基台及其施工方法

摘要

The present invention relates to an integral shift that can be usefully applied to earth pressure separation type integral shift bridges, and a method of constructing such an integral shift, and specifically, a plurality of H piles 1 installed intruding into the ground. As an integral shift (100) comprising an alternating structure (4) constructed in an integrated state with the head of the H stake (1) by the site-casting concrete so that the head of the H stake (1) is embedded, the precast floor By constructing the alternating structure 4 by the site-pouring concrete using the plate-reinforcing bar assembly 3 and the supporting plate 2, the separation between the alternating structure 4 and the ground is ensured and the ground transfer of the load through the ground is ensured. It is possible to prevent ground disturbance by suppressing, and to effectively prevent local breakdown and the like by suppressing stress concentration in the load transfer process to the H-pile 1 Relates to rebar combination with a support plate integral with the shift and construction method with the integrated structure of the H pile and concrete structure with alternating "cast bottom plate.
机译:本发明涉及一种可以有效地应用于土压分离型整体变速桥的整体变速,并且涉及一种构造这种整体变速的方法,具体地,涉及一种安装在地下的多个H桩1。作为整体换挡(100),其包括通过现场浇铸混凝土以与H桩(1)的头部成一体的状态构造的交替结构(4),从而嵌入H桩(1)的头部。预制地板通过使用钢筋加固组件3和支撑板2由现场浇筑的混凝土构造交替结构4,可以确保交替结构4与地面之间的分离,并确保地面负载传递确保。通过抑制,可以防止地面干扰,并且通过抑制向H桩1的载荷传递过程中的应力集中,可以有效地防止局部击穿等,与带有移位和构造方法的支撑板一体的钢筋组合相关。 H桩和混凝土结构的整体结构具有交替的“浇铸底板”。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号