首页>
外国专利>
WIND ENERGY INSTALLATION, LOAD DISTRIBUTION SYSTEM IN A WIND ENERGY INSTALLATION AND PROCEDURE FOR THE CONSTRUCTION OF A TOWER TO A WIND ENERGY INSTALLATION
WIND ENERGY INSTALLATION, LOAD DISTRIBUTION SYSTEM IN A WIND ENERGY INSTALLATION AND PROCEDURE FOR THE CONSTRUCTION OF A TOWER TO A WIND ENERGY INSTALLATION
展开▼
机译:风能安装中的风能安装,负荷分配系统以及风电塔安装塔的程序
展开▼
页面导航
摘要
著录项
相似文献
摘要
The invention relates to a wind energy plant (2), a load distribution system and a method for erecting a tower (4) of a wind energy plant (2). The wind energy plant (2) comprises a tower (4) and a foundation (6), wherein the tower (4) has a lower connecting flange (12) with a number of openings, and wherein the foundation (6) comprises a number of connecting elements (14 ), which protrude from an upper side (16) of the foundation (6) and in the assembled state of the tower (4) at least some of the openings of the connecting flange (12) pass through. There is provided a load distribution system having a first load distribution ring (18) and a second load distribution ring (20). The connecting elements (14) pass through the load distribution rings (18, 20) in the assembled state of the tower (4).
展开▼