Construction technique considering the optimal sequence of pilot-tunnel excavation was investigated in order to ensure the safety of construction process of long-span shallow-buried tunnel. Firstly, optimal comparisons of the effect of different sequence of pilot-tunnel excavation on the ground settlement were implemented by the numerical analysis. Secondly, an optimal construction method was determined and applied to the construction of a practical tunnel. Some key issues and procedure of the selected construction method were described in detail. Finally, the numerical modeling and calculation of the tunnel construction process were conducted, and the effectiveness of these simulations was demonstrated by using the measured data of the practical tunnel.
机译:考虑施工技术考虑了先导隧道挖掘的最佳序列,以确保长跨度浅埋隧道施工过程的安全性。首先,通过数值分析实现了不同序列的不同序列挖掘机的效果的最佳比较。其次,确定了一种最佳施工方法并应用于实用隧道的结构。详细描述了所选施工方法的一些关键问题和过程。最后,进行了隧道施工过程的数值建模和计算,通过使用实际隧道的测量数据来证明这些模拟的有效性。